{"id":3257,"date":"2021-07-28T11:06:32","date_gmt":"2021-07-28T06:36:32","guid":{"rendered":"https:\/\/enerchimi.com\/2021\/07\/28\/%d8%a7%d9%81%d8%aa%d8%aa%d8%a7%d8%ad-%d8%ae%d8%b7-%d9%84%d9%88%d9%84%d9%87-42-%d8%a7%db%8c%d9%86%da%86-%d8%a7%d9%86%d8%aa%d9%82%d8%a7%d9%84-%d9%86%d9%81%d8%aa-%da%af%d9%88%d8%b1%d9%87-%d8%a8%d9%87\/"},"modified":"2021-07-28T15:47:59","modified_gmt":"2021-07-28T11:17:59","slug":"operation-of-an-underground-42-crude-oil-pipeline-from-gurreh-in-bushehr-to-jask-port-in-hormozgan-province","status":"publish","type":"post","link":"https:\/\/www.fptch.com\/en\/operation-of-an-underground-42-crude-oil-pipeline-from-gurreh-in-bushehr-to-jask-port-in-hormozgan-province\/","title":{"rendered":"Operation of an underground 42\u201d crude oil pipeline from Gurreh in Bushehr to Jask port in Hormozgan province"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_column_text]<\/p>\n<p style=\"text-align: justify;\">Gurreh-Jask Pipeline with a length of 1000 km and a capacity of one million barrels was installed. The first phase of with a capacity of 350000 barrels was put into operation on dated 22.July.2021.<br \/>\nEnerchimi Engineering Co. was responsible for the detailed design of the Part 1-2 of this pipeline in impassable and mountainous area a length of 157 km with equipment and devices between the route of the pipeline.<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text] Gurreh-Jask Pipeline with a length of 1000 km and a capacity of one million barrels was installed. The first phase of with a capacity of 350000 barrels was put into operation on dated 22.July.2021. Enerchimi Engineering Co. was responsible for the detailed design of the Part 1-2 of this pipeline in impassable and mountainous&hellip;<\/p>\n","protected":false},"author":1,"featured_media":3253,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[29],"tags":[59,115,116],"class_list":["post-3257","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en","tag-enerchimi","tag-gurreh-jask","tag-pipeline","category-29","description-off"],"_links":{"self":[{"href":"https:\/\/www.fptch.com\/en\/wp-json\/wp\/v2\/posts\/3257","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fptch.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.fptch.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.fptch.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fptch.com\/en\/wp-json\/wp\/v2\/comments?post=3257"}],"version-history":[{"count":3,"href":"https:\/\/www.fptch.com\/en\/wp-json\/wp\/v2\/posts\/3257\/revisions"}],"predecessor-version":[{"id":3260,"href":"https:\/\/www.fptch.com\/en\/wp-json\/wp\/v2\/posts\/3257\/revisions\/3260"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fptch.com\/en\/wp-json\/wp\/v2\/media\/3253"}],"wp:attachment":[{"href":"https:\/\/www.fptch.com\/en\/wp-json\/wp\/v2\/media?parent=3257"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fptch.com\/en\/wp-json\/wp\/v2\/categories?post=3257"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fptch.com\/en\/wp-json\/wp\/v2\/tags?post=3257"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}